Potential Entries after the shift in structure
1. Look for engineering of LQs
before the BOS
2. Otherwise, look for engineering
of LQs after the BOS, potentially
confirming this refined area using
the seconds timeframe
1. Look for engineering of LQs
before the BOS
2. Otherwise, look for engineering
of LQs after the BOS, potentially
confirming this refined area using
the seconds timeframe
コメント:
Missed our Supply area